Launched · D22 Lakeside
Lucerne Grand
Lakeside Drive, beside the waterway. Homes above the Lucerne Galleria retail row, now open for sale.
Lucerne Grand is a condominium at Lakeside Drive in District 22, Outside Central Region, by CDL Polaris Properties Pte Ltd, now open for sale. It is a 99-year leasehold development of 570 units in five 17-storey blocks, with the Lucerne Galleria retail block at street level and expected vacant possession on 7 December 2031.
Sales status here is being re-verified. Ask for the current count.
Replies begin with a disclosed AI assistant.

The facts
- Developer
- CDL Polaris Properties Pte Ltd
- Address
- 30, 32, 34, 36 and 38 Lakeside Drive, District 22
- Market segment
- Outside Central Region (OCR)
- Tenure
- 99-year leasehold wef 8 September 2025
- Total units
- 570
- Blocks
- Five 17-storey blocks, with the Lucerne Galleria retail block at street level
- Unit mix
- 2BR 96 · 2BR + Study 126 · 3BR 125 · 3BR Premium + Study 128 · 4BR Premium 47 · 4BR Premium + Study 16 · 4BR Premium + Entertainment 32
- Estimated sizes
- 624 to 1,432 sqft (developer estimates, subject to final survey)
- Expected vacant possession
- 7 December 2031
- Status
- Open for sale
Updated 3 Sept 2026 · developer materials via PropNex
Prices
Developer prices and remaining units are dated below. Confirm availability before choosing a unit.
Prices here are being re-verified. Ask for the current price list.
Availability
Availability here is being re-verified. Ask for the current count.
Gallery
Developer renders of the pool deck, the blocks beside the waterway, the Lucerne Galleria and the outlook over Jurong Lake.
Site plan

Downloads
Questions
What is the tenure?
99-year leasehold from 8 September 2025. Expected VP 7 December 2031, approximately 93 years remaining.
How many units?
570 units. Scheduled to open October 2026 (target date).
Where is it located?
Chuan Park area along Lorong Chuan, near Lorong Chuan MRT (Circle Line).
Who is the developer?
CDL Polaris Properties Pte Ltd (City Developments Limited), leading Singapore developer.
When will it open?
October 2026 target (subject to change). Register interest for launch notification.
Expected completion?
7 December 2031 (approximately 6 years construction timeline).